Pre-installation checklist

Make sure you follow these steps before installing the AirNode:

  • Gather all necessary equipment (power cables, mounting tools).

  • Confirm installation site has power supply and internet access.

  • Ensure the area has proper ventilation for safe operation.

  • Identify secure mounting points for the AirNode.

Last updated